N-corp-profile
 
ABOUT US
 

Project References

DescriptionRegionMarket Segment
Binhai North H2#400MW Offshore Windfarm Substation Installation

In April 2017 NauticAWT carried out its first Offshore Windfarm Substation Installation and Grouting Operation for the renewable sector in China using NaX™ Q140-E UHPC grout. The Binhai North Phase...

Asia Subsea & Surface Facilities
Repair of Conductor Casings using Engineered Grouted Clamps

It was observed that the PA platform had a parted conductor casing, exposing the internal casings. NauticAWT was awarded the job to carry out structural integrity analysis; develop a repair...

Asia Subsea & Surface Facilities
Installation of 5 units of Vestas V117 Wind Turbines

Oestermark Grouting A/S and NauticAWT has completed the installation of 5 units of Vestas V117 Wind Turbines in the North Western part of Denmark.  The Scope Supply of NaX™ Q130 Ultra...

Europe Subsea & Surface Facilities
Pipeline Crossings Grouting Services for Mumbai High South Redevelopment Phase III

NauticAWT has completed grouting of pipeline crossings & freespans for Mumbai High South Redevelopment Phase III project (MHSRD-III). NauticAWT was awarded the contract by Kreutz Subsea Pte Ltd.  The Client...

Asia Subsea & Surface Facilities
Grouting Services for Jacket Leg MHSRD-III

NauticAWT carried out skirt pile sleeve grouting services for the installation of 3 platforms RS18, RS20 and RS21 all located in Mumbai High South field and part of the Mumbai...

Asia Subsea & Surface Facilities
Design of a Portable Cabin for Water Draw Calibration, Russia

Having completed the design of Oil Metering and Prover skids for Yamal LNG Oil Metering System, Russia, as a subcontractor to Emerson Asia Pacific, NauticAWT received the order from Hai...

Australasia, Europe Subsea & Surface Facilities
Repair of Fire Water Caissons, Premier Oil, Indonesia

NauticAWT has completed its work to upgrade the Fire Water Caissons at Anoa platform as part of its well integrity campaign for Premier Oil, Indonesia. The reinforced caissons were encased...

Australasia Subsea & Surface Facilities
XANAB-A Supplementary Pile Grouting

In December 2016 NauticAWT completed the pile grouting work associated with the installation of a supplementary structure to support the existing XANAB-A platform located in the Litoral field, in the...

Americas Subsea & Surface Facilities
Structural Repair of Breasting Dolphin Pile, Ju’aymah Field

NauticAWT has completed the structural repair of a breasting dolphin pile for a major Saudi Arabian asset owner in the Ju’aymah Field. Upon general visual inspection of the breasting dolphin,...

Middle East & Africa Subsea & Surface Facilities
Basic Design, FEED and EPCI Tender Package Preparation for a 30” subsea pipeline

NauticAWT has carried out Basic Design, FEED and EPCI Tender Package Preparation for a 30” Subsea Pipeline through a local engineering consultancy.  The Scope All the engineering work (including review of...

Middle East & Africa Subsea & Surface Facilities
Multilateral Well Completion

From July 2015 to June 2016 NauticAWT was involved in the completion operations planning, equipment inspection and preparation and on-site supervision for multilateral horizontal oil production wells in the Wandoo...

Australasia Subsurface & Wells
Well Integrity Campaign, Phase I: Inspection, Doha, Qatar

In August 2014, NauticAWT conducted a pre-job visual inspection of 24 wells for Occidental Oil and Gas, Doha, Qatar. Phase I, the Inspection Phase, was the first stage of a...

Middle East & Africa Subsea & Surface Facilities
Well Integrity Campaign, Phase II: Outer Casing Corrosion Protection, Cleaning & Grouting Services

Following the successful completion of Phase 1 of this project for Occidental Petroleum, the Inspection Phase, NauticAWT was then contracted by Dolphin Energy Ltd in Qatar to provide preventative well...

Middle East & Africa Subsea & Surface Facilities
Ramba Jetty & Dolphin Strengthening Project – Phase 1

From May to October 2015 NauticAWT worked with PT Hutama Karya (Persero) Indonesia to provide strengthening of corroded marine piles at Berthing Dolphin 1 (BD1), Berthing Dolphin 2 (BD2) and...

Australasia Subsea & Surface Facilities
Grouting Services for Additional Development of Vasai East Project

NauticAWT has completed its grouting contract for the installation phase of 2 new four legged fixed jacket platforms (VSEB and VSEC), as well as the installation of crossing and free...

Asia Subsea & Surface Facilities