Grouting Services for Jacket Leg MHSRD-III

NauticAWT carried out skirt pile sleeve grouting services for the installation of 3 platforms RS18, RS20 and RS21 all located in Mumbai High South field and part of the Mumbai...

Asia Subsea & Surface Facilities
Design of a Portable Cabin for Water Draw Calibration, Russia

Having completed the design of Oil Metering and Prover skids for Yamal LNG Oil Metering System, Russia, as a subcontractor to Emerson Asia Pacific, NauticAWT received the order from Hai...

Australasia, Europe Subsea & Surface Facilities
Repair of Fire Water Caissons, Premier Oil, Indonesia

NauticAWT has completed its work to upgrade the Fire Water Caissons at Anoa platform as part of its well integrity campaign for Premier Oil, Indonesia. The reinforced caissons were encased...

Australasia Subsea & Surface Facilities
XANAB-A Supplementary Pile Grouting

In December 2016 NauticAWT completed the pile grouting work associated with the installation of a supplementary structure to support the existing XANAB-A platform located in the Litoral field, in the...

Americas Subsea & Surface Facilities
Structural Repair of Breasting Dolphin Pile, Ju’aymah Field

NauticAWT has completed the structural repair of a breasting dolphin pile for a major Saudi Arabian asset owner in the Ju’aymah Field. Upon general visual inspection of the breasting dolphin,...

Middle East & Africa Subsea & Surface Facilities
Basic Design, FEED and EPCI Tender Package Preparation for a 30” subsea pipeline

NauticAWT has carried out Basic Design, FEED and EPCI Tender Package Preparation for a 30” Subsea Pipeline through a local engineering consultancy.  The Scope All the engineering work (including review of...

Middle East & Africa Subsea & Surface Facilities
Multilateral Well Completion

From July 2015 to June 2016 NauticAWT was involved in the completion operations planning, equipment inspection and preparation and on-site supervision for multilateral horizontal oil production wells in the Wandoo...

Australasia Subsurface & Wells
Well Integrity Campaign, Phase I: Inspection, Doha, Qatar

In August 2014, NauticAWT conducted a pre-job visual inspection of 24 wells for Occidental Oil and Gas, Doha, Qatar. Phase I, the Inspection Phase, was the first stage of a...

Middle East & Africa Subsea & Surface Facilities
Well Integrity Campaign, Phase II: Outer Casing Corrosion Protection, Cleaning & Grouting Services

Following the successful completion of Phase 1 of this project for Occidental Petroleum, the Inspection Phase, NauticAWT was then contracted by Dolphin Energy Ltd in Qatar to provide preventative well...

Middle East & Africa Subsea & Surface Facilities
Ramba Jetty & Dolphin Strengthening Project – Phase 1

From May to October 2015 NauticAWT worked with PT Hutama Karya (Persero) Indonesia to provide strengthening of corroded marine piles at Berthing Dolphin 1 (BD1), Berthing Dolphin 2 (BD2) and...

Australasia Subsea & Surface Facilities
Grouting Services for Additional Development of Vasai East Project

NauticAWT has completed its grouting contract for the installation phase of 2 new four legged fixed jacket platforms (VSEB and VSEC), as well as the installation of crossing and free...

Asia Subsea & Surface Facilities
Folawiyo Aje Services Limited (FASL), Subsea Well Completion Design, Nigeria

The Field   OML 113 is an offshore oil concession block located in the Nigerian sector of the Benin Embayment. The block contains the Aje field, which was discovered in...

Middle East & Africa Subsurface & Wells
EWT (Extended Well Test) Intelligent Well Completion Design, Kenya

The Scope  Tullow wanted to acquire interference test data from two discovered fields in the area.  The reservoirs are complex multi-layer sand/shale systems. The NauticAWT brief was to design a...

Middle East & Africa Subsurface & Wells
Plug and Abandonment of HPHT Wells in the Cooper Basin, Australia

The Scope  NauticAWT provided well site supervision and field engineering support throughout the three well abandonment campaigns. Throughout each activity, regular Pre-Job Safety Meetings and Health Safety and Environment briefings...

Australasia Subsurface & Wells
C-26 Jacket Subsea Repair Work, India

The Scope  Underwater strengthening of Structural Members and Joints was carried out at C24P1 and BB Platforms without removal of existing structural members. The scope of work included pre-engineering survey...

Asia Subsea & Surface Facilities